Our Projects
Explore our portfolio of completed and ongoing construction projects. From multi-family developments to commercial spaces and custom homes, see the quality and craftsmanship that defines RBKS Construction.
Laing Residence
Laing Project consisted of a major reconstruction and rehabilitation of the top two levels of the home. The entire roof structure was upgraded with spray foam insulation, commercial high temperature waterproofing and standing seam metal roof. Supply & install of new Fiberglass Windows were installed and new EIFS Cladding followed on a large portion of the home. New rooftop PVC Composite Decking was installed on top of a newly installed SBS Torch on rooftop deck. A new custom 3 pane sliding door was installed at the front of the home, measuring over 9 feet tall and 15 feet wide accompanied by a motorized screen.
Dorinku Tokyo Restaurant Fitout
Dorinku Project consisted of a full restaurant fitout for a repeat client. The modest space received a full demolition and disposal and new plumbing/electrical rough ins to accept design layout. New Millwork and Gypsum Board finishes made way to an extension of the existing restaurant, adding additional seating and a unique new vibe.
Liberton Terrace Building Envelope Restoration
Liberton Project consisted of a major Building Envelope Rehabilitation on 15 Buildings (43 Units) spanning over two phases. Over 400 doors and windows were replaced, including storm doors. All existing siding was replaced with new Vinyl Lap Siding installed on strapping. Roofing was replaced on 10 buildings in addition to all rainwater goods. Landscaping upgrades were completed in select areas across the property.
Axxess at Terwillegar
Axxess at Terwillegar Project consisted of a major Building Envelope Rehabilitation across the 111-unit building
Terra Centre for Teen Parents
Terra Centre Project consisted of a two-phase major interior renovation
project in an occupied building.
Cedarwood Village Building Envelope Rehabilitation
Cedarwood Village Project consisted of a major Building Envelope
Rehabilitation on 11 Buildings
Whitehall Square Building Envelope Repairs
Whitehall Project consisted of balcony rehabilitation and window/door replacements on the East 2 Building in this complex. 28 Decks received structural framing repairs and new PVC Vinyl Decking membranes. New aluminum face mounted railings were installed on all over ground decks. 129 Doors and Windows were replaced on the building along with all associated brick cladding removal, salvage and reinstallation surrounding openings. Roof parapet reconstruction, waterproofing and metal capping were completed along the entire roof perimeter. Extensive interior abatement of asbestos containing drywall was completed to facilitate framing repairs.
Urban Village Plaza Deck Waterproofing
Urban Plaza Project consisted of a full Plaza Deck Waterproofing replacement over 17,000 sq.ft. Demolition of existing sidewalks, topping slabs and landscaping made way for concrete slab repairs prior to waterproofing. Upgrades to drainage we performed across the work area including asphalt replacement in the parking lot of the complex. New landscaping finishes were also installed to cover and protect the new waterproofing system.
Central Park Plaza Deck Waterproofing
Central Park Project consisted of a full Plaza Deck Waterproofing replacement, totaling over 37,000 sq.ft. Demolition of all existing sidewalks, topping slabs and landscaping made way for concrete slab repairs prior to waterproofing. Upgrades to drainage were performed across the work area along with targeted structural concrete slab repairs. The project is being completed in two phases while maintaining full access to parkade and visitor parking stalls for residents.
Alta Vista RTOP South Tower Building Envelope Rehabilitation
Alta Vista South Tower Project consisted of Building Envelope repairs on a single elevation of the 12-story tower. Removal of existing EIFS cladding was completed to facilitate the replacement of DensGlass sheathing. New fiberglass windows were installed in select locations along with repairs to existing curtain wall system. In addition, liquid-applied traffic coatings were applied on concrete balconies. New EIFS was then completed on most of a single elevation. Select roof repairs and parapet reconstruction were also executed as part of this building envelope repair project.
Alta Vista RTOP Balcony Rehabilitation and Plaza Waterproofing
Alta Vista Project consisted of balcony rehabilitation across 36 decks. All decks received re-sloped members and new sheathing to accept new PVC Vinyl Decking. All decks received new balcony railings. New soffits, fascia, and column cladding was installed on all units. In addition, targeted Plaza Deck Waterproofing repairs were completed on select units.
Chelsea Greene Balcony Rehab
Chelsea Greene Project consisted of balcony rehabilitation across 107 decks. All decks received re-sloped members and new sheathing to accept PVC Vinyl Decking. In addition, all soffit metal, column cladding, and fascia were replaced. Railings were removed and reinstalled on all units.
Grandin Court Building Envelope Rehabilitation
Grandin Court Project consisted of traditional stucco cladding replacement. New PVC windows and sliding doors were installed in the work area along with all associated sealants. All balconies were re-sloped and received new PVC Vinyl Decking. In addition, the building perimeter parapets were waterproofed and received new metal capping. New vents, outlets, and light fixtures were replaced as part of this project.
Carrington Grande Stucco Replacement
Carrington Project consisted of traditional stucco cladding replacement with like on a portion of the building. New PVC windows were installed in the work area along with all associated sealants. Plaza Deck Waterproofing tie-ins were completed at the base of wall along the entire work area.
Infusions Plaza Deck Waterproofing
Infusions Project consisted of full Plaza Deck Waterproofing replacement across two buildings, totaling over 30,000 sq.ft. This project involved the removal of all overburden landscaping, concrete patios, concrete sidewalks, insulation, and drainage mat to expose the existing waterproofing. Waterproofing removal and surface preparation/concrete repairs were completed to accept new 2-ply Commercial SBS Waterproofing. New rock overburden was installed along with new stamped concrete patios, new sidewalks, and a new cast-in-place concrete ramp.
Liberton Terrace Building Envelope Restoration
Liberton Project consisted of a major Building Envelope Rehabilitation on 15 Buildings (43 Units) spanning over two phases. Over 400 doors and windows were replaced, including storm doors. All existing siding was replaced with new Vinyl Lap Siding installed on strapping. Roofing was replaced on 10 buildings in addition to all rainwater goods. Landscaping upgrades were completed in select areas across the property.
Axxess at Terwillegar
Axxess at Terwillegar Project consisted of a major Building Envelope Rehabilitation across the 111-unit building
Urban Village Balcony Rehabilitation
Urban Village Project consisted of balcony rehabilitation across 111
Balconies.
Cedarwood Village Building Envelope Rehabilitation
Cedarwood Village Project consisted of a major Building Envelope
Rehabilitation on 11 Buildings
Soprema Head Office Renovation
Soprema Project consisted of an office space renovation across 2 levels. The Edmonton Soprema Office received a new layout and design. New flooring, lighting, painting, and millwork were installed in the spaces. This fast-track renovation was completed in 2 months to limit delays to the client group.
Dorinku Tokyo Restaurant Fitout
Dorinku Project consisted of a full restaurant fitout for a repeat client. The modest space received a full demolition and disposal and new plumbing/electrical rough ins to accept design layout. New Millwork and Gypsum Board finishes made way to an extension of the existing restaurant, adding additional seating and a unique new vibe.
Brock Sandblasting / Coatings Facility Fitout
Brock Project consisted of a full building and attached shop renovation and reclassification from F3 to F1 rating. The office portion of the building received a full renovation, including upgraded lighting, finishes, flooring and windows. The shop received an extensive fire rated partition and reconfiguration to accommodate the clients’ needs. New commercial grade exhaust fans and MUA units were installed to serve the new spray/coatings facility. As a result, the entire building received a new Fire Suppression System and Fire Alarm System. New lighting was installed throughout the shop, including the addition of multiple overhead doors to serve as entry/exit paths for trailers. Major electrical upgrades were installed to supply power to new sandblasting and coating equipment.
Rogers Place Concrete Floor Maintenance Program
Rogers Place Maintenance Program consists of concrete rehabilitation in
high traffic areas of the arena.
Kin Bar Restaurant Fitout
Kin Project consisted of a full restaurant fitout for a repeat client. The modest space received a full demolition and disposal and new plumbing/electrical rough ins to accept design layout.
Canadian Native Friendship Center
CNFC Project consisted of a full building renovation project across 4 levels.
Terra Centre for Teen Parents
Terra Centre Project consisted of a two-phase major interior renovation
project in an occupied building.
Chan Residence
Chan Project consisted of a complete interior renovation of a residential single-family home. A new open concept layout between the kitchen and the living area was achieved by installing a 23’ beam and eliminating a partition wall. A full new kitchen and countertop was installed along with new lighting throughout the home. Interior finishes followed and brought a bright and crisp end product for the homeowners.
Forberg Residence
Forberg Project began as a leak investigation and evolved into a major rehabilitation of the top level of a high-end infill home. The entire top floor roof and rooftop patio area underwent full re-build and re-waterproof after deteriorated structural elements were repaired. A New Sloped Poly-ISO System was installed beneath the roofing to improve drainage and insulating performance. Extensive parapet work and EIFS cladding replacement on the top half of the home was completed to ensure proper tie-ins of new to old.
Laing Residence
Laing Project consisted of a major reconstruction and rehabilitation of the top two levels of the home. The entire roof structure was upgraded with spray foam insulation, commercial high temperature waterproofing and standing seam metal roof. Supply & install of new Fiberglass Windows were installed and new EIFS Cladding followed on a large portion of the home. New rooftop PVC Composite Decking was installed on top of a newly installed SBS Torch on rooftop deck. A new custom 3 pane sliding door was installed at the front of the home, measuring over 9 feet tall and 15 feet wide accompanied by a motorized screen.
Ready to start your project?
Let's bring your vision to life. Whether it's a multi-family development, commercial space, or custom home, our team of experts is ready to deliver exceptional results.




















